{"id":1636,"date":"2020-03-18T16:48:10","date_gmt":"2020-03-18T15:48:10","guid":{"rendered":"https:\/\/www.itinerarioenergia.it\/?post_type=cms-valdagno_scheda&#038;p=1636"},"modified":"2021-04-01T14:51:00","modified_gmt":"2021-04-01T12:51:00","slug":"ponte-verde-power-plant","status":"publish","type":"cms-valdagno_scheda","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/","title":{"rendered":"Ponte Verde Power Plant"},"author":1,"featured_media":1197,"menu_order":40,"template":"","categories":[46],"acf":{"abstract":"The first projects to divert the waters of the Agno between Val Calda and Ponte Verde date back to 1913 and bear the signature of engineer E. Albarello. The collected water already ran through a tunnel of about 850 metres to reach the loading tank, from which a 95 m long penstock transferred it to the engine building, to animate two Francis turbines.","testo":"<p>The first projects to divert the waters of the Agno river between Val Calda and Ponte Verde date back to 1913 and bear the signature of engineer E. Albarello.<\/p>\n<p>The dike was built to sit on &#8220;the support walls of the tramway station of Recoaro&#8221;, recently inaugurated (1911). The collected waters would then travel through a tunnel of about 850 meters to reach the loading tank, from which a 95 m long forced conduit would then lead them to the engine building where they fed two Francis turbines.<\/p>\n<p>The concession was granted in February 1916 by the Civil Engineering Authority, but significant problems soon arose. Although the project had envisaged the construction of a reinforcement wall &#8220;in case of exceptional flooding&#8221; of the Agno river, this had proved insufficient to contain its waters. As the complaints of the hotel owners of Recoaro reveal: &#8220;On the occasion of the first and mild flood in October [1918], the stream filled the artificial basin with material and determined a sudden rise of the riverbed [and the waters] invaded the underground rooms, cellars and kitchens of a dozen buildings along the bank, upsetting whatever was in them. In some cases the very consistency of some buildings was threatened [&#8230;] to such extent that the commands of some local departments lodging their troops there were compelled to immediate evacuation&#8221;. The wool mill Lanificio Mazzotto was forced to pay for damage and make the intake works of the Ponte Verde plant safer, with a more solid dam and a canal equipped with special spillways for water drainage.<\/p>\n<p>The Ponte Verde plant, owned by Eusebio Energia, is currently in operation.<\/p>\n","info":"","link_esterni":false,"indirizzo":"Via Ponte Verde, 212, 36076 Recoaro Terme VI, Italia","altitudine":"405","capacita_produttiva":"1100 MWh\/anno","foto_del_sistema":{"ID":1461,"id":1461,"title":"PONTE VERDE","filename":"PONTE-VERDE.jpg","filesize":160374,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/ponte-verde-2\/","alt":"","author":"2","description":"","caption":"","name":"ponte-verde-2","status":"inherit","uploaded_to":1636,"date":"2020-02-17 11:57:15","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":945,"height":709,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE-300x225.jpg","medium-width":300,"medium-height":225,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE-768x576.jpg","medium_large-width":768,"medium_large-height":576,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE.jpg","large-width":945,"large-height":709,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE.jpg","1536x1536-width":945,"1536x1536-height":709,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/PONTE-VERDE.jpg","2048x2048-width":945,"2048x2048-height":709}},"coordinate":{"address":"Via Ponte Verde, 212, 36076 Recoaro Terme VI, Italia","lat":45.7046964,"lng":11.2415109,"zoom":14,"place_id":"ChIJjbhsB7uteEcRIR1ECr81AE0","street_number":"212","street_name":"Via Ponte Verde","city":"Recoaro Terme","state":"Veneto","state_short":"VI","post_code":"36076","country":"Italia","country_short":"IT"},"galleria_fotografica":[{"ID":868,"id":868,"title":"1. Planimetria del progetto dell\u2019ing. A. Marzotto (1913)","filename":"1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","filesize":9952657,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/1-planimetria-del-progetto-delling-a-marzotto-1913-2\/","alt":"","author":"1","description":"","caption":"","name":"1-planimetria-del-progetto-delling-a-marzotto-1913-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:04","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":9160,"height":3636,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","thumbnail-width":150,"thumbnail-height":60,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","medium-width":300,"medium-height":119,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","medium_large-width":768,"medium_large-height":305,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","large-width":1024,"large-height":406,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","1536x1536-width":1536,"1536x1536-height":610,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/1.-Planimetria-del-progetto-dell\u2019ing.-A.-Marzotto-1913.jpg","2048x2048-width":2048,"2048x2048-height":813}},{"ID":872,"id":872,"title":"2. Particolare del progetto dell\u2019ing. A. Marzotto (1913) \u2013 Briglia di presa","filename":"2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa.jpg","filesize":646462,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/2-particolare-del-progetto-delling-a-marzotto-1913-briglia-di-presa-2\/","alt":"","author":"1","description":"","caption":"","name":"2-particolare-del-progetto-delling-a-marzotto-1913-briglia-di-presa-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:06","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":2162,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa-300x253.jpg","medium-width":300,"medium-height":253,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa-768x649.jpg","medium_large-width":768,"medium_large-height":649,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa-1024x865.jpg","large-width":1024,"large-height":865,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa-1536x1297.jpg","1536x1536-width":1536,"1536x1536-height":1297,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/2.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-\u2013-Briglia-di-presa-2048x1730.jpg","2048x2048-width":2048,"2048x2048-height":1730}},{"ID":876,"id":876,"title":"3. Particolare del progetto dell\u2019ing. A. Marzotto (1913) - Opere di presa","filename":"3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa.jpg","filesize":763128,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/3-particolare-del-progetto-delling-a-marzotto-1913-opere-di-presa-2\/","alt":"","author":"1","description":"","caption":"","name":"3-particolare-del-progetto-delling-a-marzotto-1913-opere-di-presa-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:11","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":1810,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa-300x212.jpg","medium-width":300,"medium-height":212,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa-768x543.jpg","medium_large-width":768,"medium_large-height":543,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa-1024x724.jpg","large-width":1024,"large-height":724,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa-1536x1086.jpg","1536x1536-width":1536,"1536x1536-height":1086,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/3.-Particolare-del-progetto-dell\u2019ing.-A.-Marzotto-1913-Opere-di-presa-2048x1448.jpg","2048x2048-width":2048,"2048x2048-height":1448}},{"ID":880,"id":880,"title":"4.1 Condotta (1)","filename":"4.1-Condotta-1.jpg","filesize":6771466,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-1-condotta-1-2\/","alt":"","author":"1","description":"","caption":"","name":"4-1-condotta-1-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:21","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":1700,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1-300x199.jpg","medium-width":300,"medium-height":199,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1-768x510.jpg","medium_large-width":768,"medium_large-height":510,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1-1024x680.jpg","large-width":1024,"large-height":680,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1-1536x1020.jpg","1536x1536-width":1536,"1536x1536-height":1020,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-1-2048x1360.jpg","2048x2048-width":2048,"2048x2048-height":1360}},{"ID":884,"id":884,"title":"4.1 Condotta (2)","filename":"4.1-Condotta-2.jpg","filesize":7145719,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-1-condotta-2-2\/","alt":"","author":"1","description":"","caption":"","name":"4-1-condotta-2-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:36","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":1700,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2-300x199.jpg","medium-width":300,"medium-height":199,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2-768x510.jpg","medium_large-width":768,"medium_large-height":510,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2-1024x680.jpg","large-width":1024,"large-height":680,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2-1536x1020.jpg","1536x1536-width":1536,"1536x1536-height":1020,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.1-Condotta-2-2048x1360.jpg","2048x2048-width":2048,"2048x2048-height":1360}},{"ID":888,"id":888,"title":"4.3 Centrale (1)","filename":"4.3-Centrale-1.jpg","filesize":65870,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-3-centrale-1-2\/","alt":"","author":"1","description":"","caption":"","name":"4-3-centrale-1-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:41","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":444,"height":280,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1-300x189.jpg","medium-width":300,"medium-height":189,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1.jpg","medium_large-width":444,"medium_large-height":280,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1.jpg","large-width":444,"large-height":280,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1.jpg","1536x1536-width":444,"1536x1536-height":280,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-1.jpg","2048x2048-width":444,"2048x2048-height":280}},{"ID":892,"id":892,"title":"4.3 Centrale (2)","filename":"4.3-Centrale-2.jpg","filesize":6616513,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-3-centrale-2-2\/","alt":"","author":"1","description":"","caption":"","name":"4-3-centrale-2-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:44","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":1700,"height":2560,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2-199x300.jpg","medium-width":199,"medium-height":300,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2-768x1156.jpg","medium_large-width":768,"medium_large-height":1156,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2-680x1024.jpg","large-width":680,"large-height":1024,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2-1020x1536.jpg","1536x1536-width":1020,"1536x1536-height":1536,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-2-1360x2048.jpg","2048x2048-width":1360,"2048x2048-height":2048}},{"ID":896,"id":896,"title":"4.3 Centrale (3)","filename":"4.3-Centrale-3.jpg","filesize":4689774,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-3-centrale-3-2\/","alt":"","author":"1","description":"","caption":"","name":"4-3-centrale-3-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:54","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":12598,"height":7955,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","thumbnail-width":150,"thumbnail-height":95,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","medium-width":300,"medium-height":189,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","medium_large-width":768,"medium_large-height":485,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","large-width":1024,"large-height":647,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","1536x1536-width":1536,"1536x1536-height":970,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-3.jpg","2048x2048-width":2048,"2048x2048-height":1293}},{"ID":900,"id":900,"title":"4.3 Centrale (4)","filename":"4.3-Centrale-4.jpg","filesize":568171,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-3-centrale-4-2\/","alt":"","author":"1","description":"","caption":"","name":"4-3-centrale-4-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:00:56","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":1344,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4-300x157.jpg","medium-width":300,"medium-height":157,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4-768x403.jpg","medium_large-width":768,"medium_large-height":403,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4-1024x537.jpg","large-width":1024,"large-height":537,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4-1536x806.jpg","1536x1536-width":1536,"1536x1536-height":806,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.3-Centrale-4-2048x1075.jpg","2048x2048-width":2048,"2048x2048-height":1075}},{"ID":904,"id":904,"title":"4.4 Turbina PV","filename":"4.4-Turbina-PV.jpg","filesize":37448,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/4-4-turbina-pv-2\/","alt":"","author":"1","description":"","caption":"","name":"4-4-turbina-pv-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:01:03","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":581,"height":553,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV-300x286.jpg","medium-width":300,"medium-height":286,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV.jpg","medium_large-width":581,"medium_large-height":553,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV.jpg","large-width":581,"large-height":553,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV.jpg","1536x1536-width":581,"1536x1536-height":553,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/4.4-Turbina-PV.jpg","2048x2048-width":581,"2048x2048-height":553}},{"ID":908,"id":908,"title":"5. Planimetria del progetto dell\u2019ing. F. Gorgosalice (1919)","filename":"5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919.jpg","filesize":1008427,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/5-planimetria-del-progetto-delling-f-gorgosalice-1919-2\/","alt":"","author":"1","description":"","caption":"","name":"5-planimetria-del-progetto-delling-f-gorgosalice-1919-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:01:04","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":1810,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-300x212.jpg","medium-width":300,"medium-height":212,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-768x543.jpg","medium_large-width":768,"medium_large-height":543,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919.jpg","large-width":1024,"large-height":724,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919.jpg","1536x1536-width":1536,"1536x1536-height":1086,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/5.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-2048x1448.jpg","2048x2048-width":2048,"2048x2048-height":1448}},{"ID":912,"id":912,"title":"6. Planimetria del progetto dell\u2019ing. F. Gorgosalice (1919","filename":"6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919.jpg","filesize":2939499,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/6-planimetria-del-progetto-delling-f-gorgosalice-1919-2\/","alt":"","author":"1","description":"","caption":"","name":"6-planimetria-del-progetto-delling-f-gorgosalice-1919-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:01:09","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":2560,"height":1594,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-300x187.jpg","medium-width":300,"medium-height":187,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-768x478.jpg","medium_large-width":768,"medium_large-height":478,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-1024x638.jpg","large-width":1024,"large-height":638,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-1536x956.jpg","1536x1536-width":1536,"1536x1536-height":956,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.-Planimetria-del-progetto-dell\u2019ing.-F.-Gorgosalice-1919-2048x1275.jpg","2048x2048-width":2048,"2048x2048-height":1275}},{"ID":916,"id":916,"title":"6.5 Opere di presa","filename":"6.5-Opere-di-presa.jpg","filesize":20429018,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/6-5-opere-di-presa-2\/","alt":"","author":"1","description":"","caption":"","name":"6-5-opere-di-presa-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:01:27","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":20075,"height":14642,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","thumbnail-width":150,"thumbnail-height":109,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","medium-width":300,"medium-height":219,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","medium_large-width":768,"medium_large-height":560,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","large-width":1024,"large-height":747,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","1536x1536-width":1536,"1536x1536-height":1120,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/6.5-Opere-di-presa.jpg","2048x2048-width":2048,"2048x2048-height":1494}},{"ID":920,"id":920,"title":"7. Progetto dell\u2019ing. F. Gorgosalice (1919) \u2013 ponte canale sulla Valletta Abio","filename":"7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio.jpg","filesize":379231,"url":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio.jpg","link":"https:\/\/www.itinerarioenergia.it\/en\/territorio\/energia\/ponte-verde-power-plant\/7-progetto-delling-f-gorgosalice-1919-ponte-canale-sulla-valletta-abio-2\/","alt":"","author":"1","description":"","caption":"","name":"7-progetto-delling-f-gorgosalice-1919-ponte-canale-sulla-valletta-abio-2","status":"inherit","uploaded_to":1636,"date":"2020-01-22 15:01:27","modified":"2020-03-16 13:42:26","menu_order":0,"mime_type":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.itinerarioenergia.it\/wp-includes\/images\/media\/default.png","width":1619,"height":1236,"sizes":{"thumbnail":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio-150x150.jpg","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio-300x229.jpg","medium-width":300,"medium-height":229,"medium_large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio-768x586.jpg","medium_large-width":768,"medium_large-height":586,"large":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio-1024x782.jpg","large-width":1024,"large-height":782,"1536x1536":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio-1536x1173.jpg","1536x1536-width":1536,"1536x1536-height":1173,"2048x2048":"https:\/\/www.itinerarioenergia.it\/wp-content\/uploads\/2020\/01\/7.-Progetto-dell\u2019ing.-F.-Gorgosalice-1919-\u2013-ponte-canale-sulla-Valletta-Abio.jpg","2048x2048-width":1619,"2048x2048-height":1236}}],"galleria_video":null,"audioguide":false},"_links":{"self":[{"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/cms-valdagno_scheda\/1636"}],"collection":[{"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/cms-valdagno_scheda"}],"about":[{"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/types\/cms-valdagno_scheda"}],"author":[{"embeddable":true,"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":2,"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/cms-valdagno_scheda\/1636\/revisions"}],"predecessor-version":[{"id":1652,"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/cms-valdagno_scheda\/1636\/revisions\/1652"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/media\/1197"}],"wp:attachment":[{"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/media?parent=1636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.itinerarioenergia.it\/en\/wp-json\/wp\/v2\/categories?post=1636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}